The removal and replacement of the two existing cone crushers at the Koolyanobbing mine site required structural checks and modifications to be undertaken on the existing steel support structure and concrete footings.
BWCE carried out the structural checks and also carried out a vibration analysis of the existing structure due to the operating loads from the new crushers.