The project included design and certification of various bin sizes for the storage and transportation of scrap metal. The design of the bins included loading, lifting, emptying and transportation cases for the bins.
Midwest Gas Pipeline
Design of pipe supports, anchor blocks, tank facilities and loading slabs as part of new gas pipeline. Steel and concrete works for tie-in to existing gas facility. Earthworks and drainage for the Northern hub facility.
Switchroom Design And Certification
BWCE have produced structural designs for a number of elevated switchrooms. We provide structural design, certification and inspections of the completed steel frame. We also carry out a lifting analysis for each switchroom for transport and site installation which includes the design and rating of lifting lugs.
Otway Gas Plant Upgrade
As part of upgrade works to the existing Otway Gas Plant in Victoria, BWCE provided civil and structural engineering services to the mechanical / process engineering consultants. This work included the design of steel pipe supports and piled foundations, concrete bunds and welded steel
Winder Building Certification
The Winder Building was imported from South Africa and required structural certification to ensure the structure complied with Australian Standards. The structural checks and certification included allowance for the 35T overhead gantry crane. As part of the overall crane certification submission to
Simms Metal Bins
The project included design and certification of various bin sizes for the storage and transportation of scrap metal. The design of the bins included loading, lifting, emptying and transportation cases for the bins.
Willetton Warehouse
The failed side boundary wall of a Willetton warehouse presented challenges for design and construction with the side wall failed due to excessive loading from the adjoining property.
Midwest Gas Pipeline
Design of pipe supports, anchor blocks, tank facilities and loading slabs as part of new gas pipeline. Steel and concrete works for tie-in to existing gas facility. Earthworks and drainage for the Northern hub facility.
Switchroom Design And Certification
BWCE have produced structural designs for a number of elevated switchrooms. We provide structural design, certification and inspections of the completed steel frame. We also carry out a lifting analysis for each switchroom for transport and site installation which includes the design and rating of lifting lugs.
Otway Gas Plant Upgrade
As part of upgrade works to the existing Otway Gas Plant in Victoria, BWCE provided civil and structural engineering services to the mechanical / process engineering consultants. This work included the design of steel pipe supports and piled foundations, concrete bunds and welded steel
Winder Building Certification